Construction of the new BW15 bridge in Sulzbach-Rosenberg

  • Structural engineering
  • Specialised civil engineering
  • Road and traffic route construction
  • Eiffage Infra-Süd
  • Project update

Client

Stadt Sulzbach-Rosenberg

Project volume

696.000 €

Construction time

04.2025  –  12.2025

New construction of bridge BW 15 Am Eislaufplatz:

  • Demolition of the existing bridge
  • New construction of a reinforced concrete bridge over the Rosenbach as a replacement structure for the existing reinforced concrete arch bridge with natural stone wing walls
  • New bridge construction including road connections