Bridge Buselohstraße Bochum

  • Structural engineering
  • Eiffage Infra-West

Client

Stadt Bochum

Project volume

6.4 million EUR

Construction time

September 2015 - November 2017

New construction of an arched truss bridge

New construction of an arched truss bridge (1 span) with concrete carriageway slab and new construction or development of the adjacent traffic routes (roads, roundabout, etc.).

The bridge spans 6 tracks for DB AG's long-distance and staff traffic in the Bochum - Dortmund section.
The bridge was shifted in one piece in an elevated position via an auxiliary yoke at the end of November 2016.

Bridge construction:
Spans Centre distance: 85 m
Arched spans and bridge height: 11.0 m / 12.3 m
Roadway and bridge width 10.7 m / 17.5 m

Road construction:
Roundabout and cycle paths on the new sections of Buselohstraße,
Total asphalt construction 5.100 m²
2 new bus stops
Noise protection installation as gabion wall
Earthworks incl. shoring for cable laying