New construction of an arched truss bridge (1 span) with concrete carriageway slab and new construction or development of the adjacent traffic routes (roads, roundabout, etc.).
The bridge spans 6 tracks for DB AG's long-distance and staff traffic in the Bochum - Dortmund section.
The bridge was shifted in one piece in an elevated position via an auxiliary yoke at the end of November 2016.
Bridge construction:
Spans Centre distance: 85 m
Arched spans and bridge height: 11.0 m / 12.3 m
Roadway and bridge width 10.7 m / 17.5 m
Road construction:
Roundabout and cycle paths on the new sections of Buselohstraße,
Total asphalt construction 5.100 m²
2 new bus stops
Noise protection installation as gabion wall
Earthworks incl. shoring for cable laying