Berkersklamm tunnel B 38 Mörlenbach bypass

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Tunnelling technology
  • Eiffage Infra-Süd

Client

Hessen Mobil Straßen- und Verkehrsmanagement

Project volume

25.7 million EUR net

Construction time

July 2024 - October 2026

B 38 OU Mörlenbach, construction of the Berkersklamm tunnel

Joint venture with HOCHTIEF Infrastructure GmbH

  • Approx. 125,000 m³ excavation / excavation of tunnel and precuts
  • Construction of the tunnel lining and two portal structures
  • Construction of the retaining walls and the operations building (shell)
  • incl. construction of an extinguishing water basin and pollutant retention basin
  • approx. 3,300 m² road superstructure