Track layout change at Düsseldorf-Gerresheim station

  • Track and railway construction
  • Eiffage Infra-Nordwest

Client

DB Netz AG

Project volume

8.900.000 €

Construction time

09.2021  –  10.2024

Renewal of all points and sidings at Düsseldorf-Gerresheim railway station

Renewal of all points and sidings at Düsseldorf-Gerresheim station.

Complete renewal of the ballast in the area undergoing refurbishment; installation of PSS and partial replacement of the subgrade to improve the subgrade; installation of new deep drainage / collection pipe and filter basin extending to the River Düssel.

This included the following works:

  • 10 sets of points reconstruction
  • 3,000 m of track renewal
  • 5,500 tonnes of base ballast laid
  • 13,000 tonnes of KG I / KG II ballast laid
  • 12,000 tonnes of soil disposal
  • 1,950 m of deep drainage
  • Underground cable works
  • Construction of a new soil filter basin