Signalling boom in Herzogenrath

  • Structural engineering
  • Eiffage Infra-West

Client

DB Netz AG, Köln

Project volume

0.17 million EUR

Construction time

4 months

Delivery and installation of a signalling boom including planning, foundation and steel superstructure

Infrastructure expansion at Herzogenrath station

This included the following services:

  • Planning services, implementation planning including stability analyses
  • Signal cantilever (box girder, single-hipped, clamped)
    clear height 7.8 above SO m, cantilever length 7.0 m
  • Foundation
    Bored pile ⵁ1.0 m and length 11.0 m
  • Foundation head including anchor bar
    1.5 x 1.5 x 1.6 m (L/W/H)