Rapphofs Mühlenbach watercourse development and new bridge construction

  • Structural engineering
  • Civil engineering
  • Eiffage Infra-West

Client

Lippeverband Essen

Construction time

19 months

Rapphofs Mühlenbach riverbed deepening and replacement of Altendorfer Straßen bridge in Dorsten.

Rapphofs Mühlenbach watercourse regulation
A deepening of the river bed and widening of the profile between km 4.4 and 4.9 were carried out to rectify the disturbances to the receiving watercourse caused by mining activities.

Bridge demolition on Altendorfer Straße and at a farm access road
Construction of a new farm access road
Use of a temporary bridge
Replacement construction of the Altendorfer Straße bridge over the Rapphofs Mühlenbach stream
Road construction work on Altendorfer Straße