Railway station bypass 3rd BA in Hagen

  • Structural engineering
  • Civil engineering

Client

Wirtschaftsbetrieb Hagen WBH

Project volume

8.8 million EUR

Construction time

November 2016 - February 2020

New construction of a single-span bridge in steel composite construction as well as road construction work and soil remediation

Construction of a newly aligned road section to relieve congestion in Hagen city centre in the area of the main railway station, including bridge construction over the DB as well as site remediation of old heavy industrial wasteland.

Lot 1 approx. 6,500 m² road construction
Structural backfill/ embankment fill

Lot 2 Engineering structures
New construction of a single-span bridge in steel composite construction as well as the retaining walls flanking the adjoining road areas.
The structure has a bridge area of 1,700 m² and the centre span is 52 m.

Lot 3 Enervie AG cable and pipe network
Lot 4 Soil remediation
Lot 5 Lighting
Lot 6 Traffic engineering