Construction of a new driver safety centre in Oberkrämer

  • Structural engineering
  • Eiffage Infra-Ost
  • Project update

Client

ADAC

Project volume

4.800.000 €

Construction time

11.2024  –  11.2025

Construction of a driver safety centre with ancillary buildings.

Roadworks and civil engineering, reinforced concrete works, prefabricated element installation

This includes, amongst other things, the following services:

  • Construction of reinforced concrete foundations
  • Construction of a cistern structure with a pumping station, valve station and sedimentation plant using prefabricated elements.
  • Asphalt surface in 3 modules with approx. 22,000 m³ of crushed stone base course
  • Earthworks (approx. 3,000 m³ of open excavation)
  • Installation of pressure pipelines; drainage pipes and underground cable works, including manholes
  • Kerbs and paving works