Construction of an angular retaining wall with installation of a rear drainage and dewatering pipe including associated shaft structures as well as various site improvements during construction
- Angled retaining wall as semi-prefabricated part with in-situ concrete spur
- To support the approx. 7.5 m high terrain offset between the later
DHL logistics centre and the so-called Planstraße A
- Load transfers from an up to 10 m high noise protection wall (and alternatively a noise protection wall) placed on the angular retaining wall.
wall (and alternatively a corresponding noise barrier) must be
- Total length of retaining wall approx. 580 m - Pipe laying work (steel pipes and plastic pipes)