MARK 51°7 in Bochum, lot 1.8

  • Civil engineering
  • Eiffage Infra-West

Client

Bochum Perspektive 2022 GmbH

Project volume

2.38 million EUR

Construction time

February 2017 - November 2017

Reactivation and development of the site of the former Opel plant 1 in Bochum (MARK 51°7)

Construction of an angular retaining wall with installation of a rear drainage and dewatering pipe including associated shaft structures as well as various site improvements during construction

  • Angled retaining wall as semi-prefabricated part with in-situ concrete spur
    - To support the approx. 7.5 m high terrain offset between the later
    DHL logistics centre and the so-called Planstraße A
    - Load transfers from an up to 10 m high noise protection wall (and alternatively a noise protection wall) placed on the angular retaining wall. 
    wall (and alternatively a corresponding noise barrier) must be

    - Total length of retaining wall approx. 580 m
  • Pipe laying work (steel pipes and plastic pipes)