Repair of the embankment wall on the Main-Danube Canal in Nuremberg, Lot 3 Civil Engineering (drainage and road construction):
- Anchoring of the embankment wall slats
- Renewal of the drainage system behind the embankment walls
- Renewal of the path surfacing and surface drainage