Nuremberg tramway track construction Allersberger Straße

  • Track and railway construction
  • Eiffage Infra-Süd
  • Project update

Project volume

EUR 1.96 million net

Construction time

May 2026 - May 2027

VAG Nuremberg, track renewal Allersberger Straße, lot 1: slab track

  • Renewal of the track system with dismantling and new track construction over a length of approx. 500 metres
  • Lot 1: a total of approx. 700 metres of track as slab track
  • Refurbishment in existing position
  • Route optimisation with slight displacement of the tracks
  • Cover photo and photo 1-3 Copyright VAG Nuremberg