Irsching power station in Vohburg an der Donau, construction of a property protection system for the plant building:
- Earthworks and strip foundations for a new fence system as property protection for the plant building
- approx. 15,000 m³ excavation with interim storage incl. 850 m³ soil disposal
- approx. 10,500 m of strip foundations
- approx. 4,000 m³ concrete work
- approx. 680 to. reinforcement
- approx. 5,500 m earthing cable (laying and connection)