Construction of the new 380 kV overhead line between Emden-Ost and Conneforde, Lot 2
- Light-duty track construction
- Heavy-duty track construction
- Installation of 5 temporary bridges
- Pole foundations on bored piles
- Dismantling of foundations for existing power lines
- Gravel
- Open drainage