Conneforde

  • Structural engineering
  • Specialised civil engineering
  • Eiffage Infra-Spezialtiefbau

Client

Eiffage Energie Transport & Distribution (TenneT)

Project volume

7.5 million EUR

Construction time

03/2020 - 01/2022 (22 months)

New construction of the 380 kV overhead line Emden-Ost - Conneforde, lot 2

  • Light road construction
  • Heavy road construction
  • Assembly of 5 temporary bridges
  • Mast foundations on bored piles
  • Dismantling foundations of existing pipelines
  • Ballast
  • Open dewatering