Concrete refurbishment, renewal of the coping and carriageway, reinforcement of the main concrete girders and installation of additional steel cross girders to connect the two superstructures
- Removal and new construction of the carriageway surface on, in front of and behind the structure
- Removal and new construction of the caps on the substructures
- Dismantling and new construction of the noise barriers and transition structures
- Bearing replacement and renewal
- Concrete refurbishment
Using a system specially developed for this bridge, the two refurbished partial bridges are coupled together with additional cross girders and thus receive additional stability.