Becherhöll Bridge Lahnstein

  • Structural engineering
  • Eiffage Infra-West

Client

Landesbetrieb Mobilität Diez

Project volume

1.55 million EUR

Construction time

June 2015 - November 2016

B 42 flyover over Becherhöllstraße in Lahnstein

Concrete refurbishment, renewal of the coping and carriageway, reinforcement of the main concrete girders and installation of additional steel cross girders to connect the two superstructures

  • Removal and new construction of the carriageway surface on, in front of and behind the structure
  • Removal and new construction of the caps on the substructures
  • Dismantling and new construction of the noise barriers and transition structures
  • Bearing replacement and renewal
  • Concrete refurbishment

Using a system specially developed for this bridge, the two refurbished partial bridges are coupled together with additional cross girders and thus receive additional stability.

The Rhein-Zeitung, Bad Ems/Lahnstein edition, published a detailed article on this.
Click here for the article (with the permission of the Rhein-Zeitung)