Client
Staatliches Bauamt Bamberg
Project volume
9 million EUR
Construction time
19 months
Construction of flyover structure 8-1 over the future two-lane B173Construction of BW 7-1 for underpassing a future flood trough Road construction for the relocation of the B173 over a length of 1,022 m