B173 Lichtenfels BW 8-1 and BW 7-1

  • Civil engineering
  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd

Client

Staatliches Bauamt Bamberg

Project volume

9 million EUR

Construction time

19 months

Construction of flyover structure 8-1 over the future two-lane B173
Construction of BW 7-1 for underpassing a future flood trough 
Road construction for the relocation of the B173 over a length of 1,022 m