VZB and VZA for the Bad Oeynhausen northern bypass

  • Structural engineering
  • Road and traffic route construction
  • Eiffage Infra-West

Client

Landesbetrieb Straßenbau NRW RNL Ostwestfalen-Lippe

Project volume

6.88 million EUR

Construction time

November 2017 - April 2019

New construction of 29 VZ bridges and cantilevers as part of the new construction of the A 30 motorway, Bad Oeynhausen northern bypass.

New construction of a total of 12 VZ cantilevers and 17 VZ bridges in the course of the new construction of the A 30 motorway, Bad Oeynhausen northern bypass, as well as in the connection areas to existing sections of the A 30 motorway and the B 61.

Production, delivery and installation of

  • 5 non-designed and non-accessible VZB
  • 2 non-designed and accessible VZB
  • 3 non-designed and non-accessible VZA
  • 9 designed and non-accessible VZA
  • 6 designed and non-accessible VZB
  • 4 designed and accessible VZB
  • associated signposts

Dismantling of sign panels, riders
Demolition of 5 concrete VCBs, removal of foundations
Dismantling of one steel VCB

Special feature:

  • Extensive deep foundations DU = 120, L = 17 m
  • Designed VZ girders, deviating from the guideline drawing VZB10
  • High demands on visual quality