Hauptstraße area (B 235) from the end of Bochum Stiftstraße to the connection to construction phase B.
Eiffage Infra-West carried out the following work in BA C together with its sister company Eiffage Infra-Nordwest:
Track construction over a length of 760 m
Road construction
Drainage with RRB
Line coordination