Tram line 310 in Witten, BA C

  • Road and traffic route construction
  • Eiffage Infra-West

Client

Bogestra, Bochum

Construction time

13 months

Extension of tram line 310 Bochum - Witten, construction phase C

Hauptstraße area (B 235) from the end of Bochum Stiftstraße to the connection to construction phase B.

Eiffage Infra-West carried out the following work in BA C together with its sister company Eiffage Infra-Nordwest:

Track construction over a length of 760 m
Road construction
Drainage with RRB
Line coordination