Thyssen bridge in Mülheim

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-West

Client

Stadt Mülheim an der Ruhr

Project volume

10.4 million EUR

Construction time

30 months

Expansion of Oberhausener Straße (B223) and new construction of the Thyssen Bridge in Mülheim.

Road, track & structural engineering, construction of the cable conduit system

  • Construction of the bridge structure north of the existing bridge
  • Superstructure in steel composite construction (80 m x 25 m, 3 lanes and 2 tram tracks)
  • New construction of retaining walls
  • Construction of cable routes in the area of the new bridge
  • Renewal of the railway tracks
  • The road construction includes the complete new construction of the B 223, Oberhausener Straße, over a length of 485 m as well as the ancillary facilities.
  • Dismantling of the "old" Thyssen bridge

News:
https://hwb.eiffage-infra.de/news/2019/07/fertigstellung-der-neuen-thyssenbruecke