Zell viaduct

  • Structural engineering
  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Süd
  • Project update

Project volume

EUR 9 million net

Construction time

January 2026 - July 2027

Bad König, replacement construction of Zell viaduct, B45 UF Mümling via DB

  • Functional tendering (planning and execution)
  • Construction of the new bridge replacement in the same location
  • Length of the viaduct: approx. 120 metres
  • Prestressed concrete superstructure with construction on falsework
  • Adaptation of the B45 (full extension) to the new structure, including the Helmertweg junction and renewal of the road surface up to the B45 - Jakob-Maul-Straße junction
  • Resurfacing of the existing cycle path
  • Dismantling of the temporary bridge during construction and construction road