DB is replacing six old signal boxes with a new electronic signal box (ESTW), which will control railway operations around Lindau (Lake Constance) in the future.
HWB was commissioned to build 8 new signal booms in the Lindau railway junction.
Railway lines 5362, 5420 and 5421
Execution under rolling wheel
This included the following services:
- Planning, manufacture, delivery and installation of 8 signalling booms
- Deep foundations using bored piles
with a diameter of 1.0 m
with lengths of up to 8 m
and attached foundation heads (dimensions 1.6 x 1.6 x 1.5 m L/W/H)