EIW rehabilitated the carriageway of the Olfen bypass (B 235 AN 33 and 34) and a bridge structure over a length of 2,100 m on behalf of Landesbetrieb Straßen NRW.
Milling 22,300 m² of carriageway, cleaning the base
Producing 22,300 m² of asphalt binder course and surface course