Renewal of the double-track railway level crossing Berliner Tor
Construction of a truss bridge of approx. 1,000 tonnes
Steel superstructure incl. construction stages
2 auxiliary S-Bahn bridges
approx. 600 m bored pile foundation
approx. 1,500 m track superstructure
Demolition and disposal of the two existing bridge structures and superstructure, LST (RSTW)
Railway overpass Berliner Tor
- Civil engineering
- Structural engineering
- Eiffage Infra-Nordwest