New railway overpass Emscherbrücken

  • Civil engineering
  • Structural engineering
  • Eiffage Infra-Nordwest

Client

DB Netz AG, Duisburg

Project volume

6.7 million EUR

Construction time

04/2018 - 05/2020 (25 months)

Construction of two new railway overpasses over the Emscher in Oberhausen as part of the Betuwe line. Extension of the three existing lines by two further lines.

  • Construction of four concrete abutments on bored piles
  • Construction of two truss bridges
  • Special civil engineering works consisting of shoring and bored pile works
  • Superstructure and track construction work
  • Disposal and demolition of a gas pipeline bridge