New community centre in Ober-Flörsheim

  • Building construction
  • Eiffage Infra-Südwest

Client

Verbandsgemeinde Alzey-Land

Project volume

390,000 EUR

Construction time

11/2016 - 03/2017

New construction of a community centre in Ober-Flörsheim

Special features:
 

Hall construction:

  • single-storey building in solid construction
  • Reinforced concrete floor slab on gravel pack
  • Solid wall trusses BSH, lignotrendelement on top
  • Roof covering made of aluminium profiled sheets (barrel roof)
  • Floor area: approx. 15 x 25 m
  • Eaves height: approx. 5.50 m

 

Construction of outbuilding:

  • Single-storey building in solid construction
  • Reinforced concrete floor slab on gravel pack
  • Reinforced concrete ceiling
  • Flat roof structure with foil/green roof (extensive)
  • Attic height: approx. 4 m