Single-span, closed reinforced concrete frame in in-situ concrete construction
Clear flow cross-section b/h = 2.0/2.5m
Total length of frame base: approx. 37m
Installation of the frame structure between the existing abutment and wing walls after removal of the old bridge vault
Road superstructure on top of the covered structure
Mühlenbach bridge in Nieheim
- Civil engineering
- Structural engineering
- Eiffage Infra-West
