Mühlenbach bridge in Nieheim

  • Civil engineering
  • Structural engineering
  • Eiffage Infra-West

Client

Kreis Höxter

Project volume

8 months

Bridge construction for the subway of the Mühlenbach in Nieheim, Höxter district

Single-span, closed reinforced concrete frame in in-situ concrete construction
Clear flow cross-section b/h = 2.0/2.5m
Total length of frame base: approx. 37m
Installation of the frame structure between the existing abutment and wing walls after removal of the old bridge vault
Road superstructure on top of the covered structure