Client
Mainzer Verkehrsges. mbH
Project volume
9.8 million EUR (total volume) 2.5 million EUR (track construction volume)
Construction time
06/2014 - 07/2016
Extension of the tramway network from Mainz main station to Lerchenberg. Mainz to Lerchenberg
5,400 m total length, of which