LSW Sportanlage Dieselstraße wooden elements

  • Noise protection
  • Eiffage Infra-Lärmschutz

Client

Freie und Hansestadt Hamburg, Sportstättenamt

Project volume

0.35 million EUR (net)

Construction time

1.5 months

Construction of a noise barrier with integrated grandstand roof in Hamburg, Barmbek district.

As part of development plan 23, Barmbek-Nord, a noise barrier is being erected in the area of the sports centre. The foundation of the noise barrier and the integrated grandstand roof will be on in-situ concrete bored piles with a diameter of 90 cm. The grandstand in front is supported by the LSW posts and wall plinths. The wall elements are highly absorbent timber elements on one side.