Köpenick(a) - Erkner(a)

  • Track and railway construction
  • Eiffage Infra-Nordwest

Client

DB Netz AG / DB Service & Station AG Berlin

Project volume

41.9 million EUR

Construction time

06/2015 - 12/2019 (55 months)

ABS Berlin - Frankfurt/Oder - Gr D/Pl + S 3 East; planning section (PA) 17 Köpenick(a) - Erkner(a)

Renewal of the double-track line 6153 between km 13.58 Köpenick and km 23.00 (9.42 km) Erkner to increase the travelling speed as well as the axle load parallel to the existing double-track S-Bahn line including substructure, track construction, structural engineering and equipment under railway operation in closed intervals.
 

  • New construction of 3 railway overpasses during railway operations
  • Renewal of 2 pedestrian subways in the listed surroundings
  • Adaptation work on the station access areas in the listed surroundings
  • approx. 3,900 m of noise barrier work
  • approx. 19,580 m track removal
  • approx. 18,570 m new track construction
  • approx. 410,000 tonnes of demolition materials and disposal
  • approx. 48,000 tonnes of PSS
  • approx. 13,000 m cable duct
  • approx. 35,480 m of track work
  • approx. 1,540 m of conductor rail work in the suburban railway area