- Remove 5,200 m³ topsoil, load, place on windrow
- Deliver and install 7,500 m³ HKS 0/45 ballast base course
- 5,530 m³ Delivery and installation of a BaseLith 0/45 base course
- 2,100 m³ Delivery and installation of a HKS 0/45 ballast base layer as a cushioning layer
- 10,900 m³ of backfill and soils removed, loaded, transported, piled up and partially reinstalled
- 15,000 tonnes of backfill and soil removed, loaded and disposed of, Z 0 + Z 1.2
- Supply and install 1,450 m cable conduit OD 160 mm
- Supply 740 m empty conduit for fibre optic cable and lay on sand bed
Hünxer Heide wind turbines
- Civil engineering
- Eiffage Infra-West