- Construction of the temporary crossing over the Herdicksbach stream
- Construction of the single-span reinforced concrete bridge with flat-founded abutments
over the Herdicksbach (next to the temporary crossing), span 8 m and 9 m wide - Construction of the rainwater retention basin incl. throttle and emergency overflow
(RRB and pipework Herdicksbach) - Construction of the rainwater drainage system from the RRB inlet to manhole R33
- Soil management
- Successive construction of expansion stage 1 in the planned streets 3 to 11
incl. sewers, HA and utilities - Drainage / sewer construction
- Final road construction (when 90 % of the building construction work has been completed)
Großer Kamp in Waltrop
- Civil engineering
- Eiffage Infra-West