Complete development of the DHL Express commercial property, covering a total area of 9,000 m².
- Earthworks and sewer construction work;
- Soil stabilisation to a depth of 2.50 m; laying and connection of drinking water, gas, rainwater, wastewater, electricity and high voltage current;
- Preliminary work for building construction: construction of foundation trenches, frost aprons
- 5,700 m² road construction for paved surfaces in asphalt, as well as 800 m² paving with concrete paving/ecopaving.