In Lüstringen, the consortium ENlag16 GA3, consisting of Eiffage Infra-Nordwest and De Romein, is carrying out the construction of a cable conduit system. The core construction time is around two years. Around 65,000 cubic metres of liquid soil will be installed on the construction site, the processing of which is heavily dependent on the weather.
Before construction work begins, archaeological excavations will be carried out to secure and document any historical finds. The measure serves to expand and secure the pipeline infrastructure in the project area.