Eiffage Infra-Spezialtiefbau GmbH is responsible for the complete services for the foundations of the electricity pylon, including the installation and alignment of the lower section of the pylon at 46 locations in the 21 km long planning approval section 1 of the project.
The Eiffage Infra-Spezialtiefbau GmbH team is constructing the bored pile foundations itself using two of its own machines and is managing the entire subcontractor assignment for the provision of the subsequent services. These include groundwater management, excavation and shoring work and pile head processing, as well as pile quality control, positioning and alignment of the pylon base and the subsequent reinforced concrete work on the pylon foundation heads visible above ground and the final backfilling of the excavation pit.
We are proud to be able to contribute to the infrastructural basis of the energy transition with this and numerous other overhead line construction projects, so that green electricity can soon be fed from the coasts into the German electricity transmission grid.
Conneforde Cloppenburg - Together we are driving the energy transition forward
- Specialised civil engineering
- Eiffage Infra-Spezialtiefbau