Computer Centre Frankfurt

  • Structural engineering
  • Eiffage Infra-Südwest

Client

Telehouse Deutschland GmbH

Project volume

11.5 million €

Construction time

March 2022 - February 2024

The Telehouse data centre is centrally located in Frankfurt am
Main and, with an area of approx. 50,000 square metres
one of the largest and most modern data centres in Germany.
Germany. Eiffage Infra-Südwest was commissioned with the construction of a further
building to expand the data centre.
 

  • Relocation of the municipal drainage channel in the
    groundwater area
  • Installation of a groundwater purification system
  • Excavation pit with Berlin shoring
  • Shell construction with drainage pipes and backfilling of the
    working areas
  • Empty conduit installation with distribution shafts for data cables
    and power supply
  • Construction of the outdoor facilities