B58N Sealing wall BW 2, BW 3 Wesel

  • Specialised civil engineering
  • Eiffage Infra-Spezialtiefbau

Client

Landesbetrieb Straßenbau NRW

Project volume

29.6 million EUR

Construction time

29 months

Construction of an approx. 1,400 metre-long surrounding cut-off wall to protect a cut in the B58n from groundwater and flooding. The wall depth varies from 18.65 m to 25.65 m. The construction was carried out as approx. 742 m single-phase and approx. 544 m two-phase diaphragm wall (D = 80 cm) as a cut-off wall. In addition, sheet piling was installed to secure the excavation pit.