B 219 in Münster-Sprakel

  • Road and traffic route construction
  • Building repair
  • Eiffage Infra-West

Client

Landesbetrieb Straßen NRW RNL Münsterland

Project volume

1.32 million EUR

Construction time

November 2015 - December 2015

Renovation of the surface of the B 219 in three parallel construction phases in Greven and Münster-Sprakel and renovation of various structures and cross culverts.

  • 45,000 m² rehabilitation area with production of an asphalt reinforcement
  • Of which 36,000 m² renewal of the asphalt binder course and asphalt surface course
  • 3,000 m² damaged area renovation with asphalt base course
  • Rehabilitation of 6 culverts
  • Renovation of 2 structures
  • Various traffic routing with one-way traffic control, traffic light control
    and narrowed, two-lane traffic routing
  • 2,900 m² surface course rehabilitation on a cycle path