Construction of the "Rheda 2000" ballastless track system in the 5,830 m long double-track section with four single-track tunnels, bridges and several troughs.
Construction of the "Eiffage" trafficable track covering system in the Falkenberg tunnel.
Construction work carried out:
- Construction of around 11,647 m of "Rheda 2000" slab track system in single-track tunnels, in single-track troughs, on structures and on bridges
- Construction of the transition areas in the slab track
- Construction of the "Eiffage" carriageway deck system in the single-track Falkenberg tunnel (2 times approx. 2,640 m)