- 68,000 m² demolition of concrete carriageway
- 500 m sewer renewal
- 2,590 m sewer rehabilitation
- 3,000 m drainage pipes
- 21,000 m³ frost protection installation
- 70,000 m² cement stabilisation
- 68,000 m² asphalt paving
Special feature:
Construction of a second concrete carriageway (Reichsautobahn) underneath the carriageway