A 6 Wattenheim

  • Road and traffic route construction
  • Civil engineering
  • Eiffage Infra-Südwest

Client

LBM Autobahnamt Montabaur

Project volume

6.5 million gross incl. structural repairs EUR

Construction time

04/2018 - 10/2018

Major resurfacing between the Grünstadt junction and the Enkenbach-Alsenborn junction in the direction of Saarbrücken

  • 68,000 m² demolition of concrete carriageway
  • 500 m sewer renewal
  • 2,590 m sewer rehabilitation
  • 3,000 m drainage pipes
  • 21,000 m³ frost protection installation
  • 70,000 m² cement stabilisation
  • 68,000 m² asphalt paving

Special feature:

Construction of a second concrete carriageway (Reichsautobahn) underneath the carriageway